Architectural drawings fora villa, explained
What architectural drawings an architect makes for a Bali villa, from first concept to the construction set: what each sheet is for, how to read it, and what a builder can price at each stage.
The render is not the drawing
Nobody builds a villa from a render. Builders build from architectural drawings: flat, black-and-white sheets full of lines, numbers and small symbols.
The 3D image shows how the villa might feel. The drawings say where every wall, pipe, socket and tile goes, and how thick, and in what material. If something is not on a sheet, someone decides it on site. Usually that is a worker with a question and no time to wait.
Most owners only see two or three sheets during design. That is normal. But it means many people sign a building contract without knowing what the builder actually has in hand. This guide walks through the full set for a Bali villa: what each sheet is for, how to read it in plain terms, and what a builder can and cannot price from it.
The render sells the idea. The drawings decide the price, the schedule and the quality.
The set does not appear all at once. It grows in four stages.
Four stages, four stacks of sheets
The chart shows which drawings exist at each design stage, and roughly how many of a builder's questions they can answer.
- Site sketch
- Plan sketch
- 3D views
- Site plan
- Floor plans
- Elevations
- Rough sections
- Roof plan
- Site plan
- Floor plans
- Elevations
- Sections
- Roof plan
- Structure outline
- Utility layouts
- Plans · elevations
- Sections · roof
- Details
- Door/window sched.
- Electrical
- Plumbing
- Structural (eng.)
- Finishes sched.
Concept is about the idea: where the house sits on the plot, how the rooms connect, how it catches the breeze. Schematic fixes the layout and the look, at a rough scale. You may hear these called 30 %, 60 % and 90 % design. Those numbers are a shorthand for how complete the set is, not an exact measure.
The permit set is what you submit for the building approval (PBG) through the government's SIMBG portal. It needs architectural, structural and utility drawings, as set out under Government Regulation 16/2021. Requirements vary by regency, so check the current list with the local office. The construction set is the one the builder works from every day.
So what is actually on each of those sheets?
Every sheet in the set, in plain words
A full villa set usually holds the eleven kinds of sheet below. Some villas need extra sheets, such as a pool or a retaining wall.
- Site plan. The house seen from above, on its plot. It shows boundaries, setbacks, the driveway, the pool, trees, levels and north. It answers: does it fit, and where does the water go?
- Floor plans. A cut through each floor at about 1 m high, seen from above. Walls, doors, windows, rooms and dimensions. This is the sheet most owners know.
- Elevations. Each face of the house, seen straight on. They show heights, window shapes, materials and the roof line.
- Sections. The house sliced from roof to foundation, seen from the side. Floor heights, ceiling heights, steps, roof build-up. Where sun and rain meet the building.
- Roof plan. The roof from above: slopes, ridges, gutters, downpipes and where the water lands.
- Details. Small parts drawn large: a window sill, a shower drain, a stair, a roof edge. This is where leaks are prevented.
- Door and window schedule. A table with every opening: size, frame, glass, hardware, which way it opens. Suppliers price straight from it.
- Electrical layout. Sockets, switches, lights, the AC units, the main panel and the circuits between them.
- Plumbing layout. Clean water, hot water, waste, the septic tank and rainwater, with pipe sizes and falls.
- Structural drawings. Foundations, columns, beams, slabs and reinforcement. These are calculated and drawn by a structural engineer, then coordinated with the rest of the set.
- Finishes schedule. Room by room: floor, wall, ceiling, skirting, paint colour and brand. Without it, every quote assumes something different.
That is a lot of paper. Luckily, every sheet follows the same few rules.
How to read a drawing in five minutes
You do not need training to read architectural drawings. Start with these six things on any sheet.
- The title block. Bottom right. Sheet name, number, scale, date and revision letter. Always check you hold the latest revision.
- The scale. 1:100 means 1 cm on paper is 1 m on site. Plans are often 1:100, details 1:5 to 1:20.
- The units. Dimensions are usually in millimetres. 3600 means 3.6 m.
- The north arrow. It tells you where the morning and afternoon sun come from.
- Section and detail marks. A circle with a number and a sheet code points you to another drawing that shows that spot in more depth.
- Line weight. Thick lines are cut walls. Thin lines are things seen beyond. Dashed lines are hidden or above, such as a roof edge.
Then do one simple test. Stand in a room on the floor plan and imagine the view. Find the same room on the section and check the ceiling height. Look at the electrical layout and ask: where does my phone charge at night? If you can't answer, ask. A good set lets you answer most of these by yourself.
Symbols are the last piece. A door is drawn as a line with a quarter circle that shows which way it swings. A window is a thin double line inside the wall. A small triangle or cross with a number marks a floor level, such as +0.45, which means 45 cm above the reference point. On the electrical sheet, each socket, switch and light has its own symbol, and a legend on the same sheet explains them. If a symbol is not in the legend, ask what it means before anyone builds it.
Reading is easy. The hard part is having enough sheets to read.
The construction set: what the builder builds from
The construction set, also called working drawings, is the biggest part of the design work. In the IAI fee guideline, design development and working drawings take about 45 % of an architect's fee. Our guide on how to choose an architect in Bali shows the full split.
That share is there for a reason. The construction set coordinates everything. The beam in the structural drawing must not cross the AC duct. The floor drain must sit where the tile falls toward it. The window in the elevation must match the schedule and the opening in the wall.
A permit set rarely does this. It shows enough for the approval, not enough to build without questions. When owners go straight from permit drawings to building, the gap gets filled on site, one decision at a time.
One printed set, one revision, on the table every day.
Ask that the site always works from the latest revision. Old copies should be collected, not left in a corner.
And inside that set, the smallest drawings carry the biggest risks.
Details and dimensions: where the money goes
In Bali, many problems after handover come from a few places: water at window sills, shower floors that don't drain, roof edges that drip on the wall, and steps that are a few centimetres off. All of them are details.
A detail drawing shows that one spot at a large scale, often 1:5 or 1:10. It says which layer goes first, how much slope, where the waterproofing turns up the wall and how far a drip edge sticks out. Without it, each worker builds the corner the way they did on the last job.
Dimensions work the same way. A plan that gives room sizes but not wall-to-wall, opening and level dimensions forces the site team to measure from the drawing with a ruler. Small errors stack up. A good set has a dimension for every wall, opening and floor level, and one fixed reference point on site.
A change on paper costs an eraser. The same change after the plaster is on costs a hammer, a week and new materials.
Sockets, sills and shower heads all need a written height.
Before the walls close, walk the site with the electrical and plumbing sheets. Check each mark against the drawing.
Some gaps appear on almost every villa site. They are worth knowing by name.
Five gaps that show up on site
These are the questions we hear most often from site teams working from incomplete sets. Each one is cheap to answer on paper and slow to answer on site.
- "Where does the rainwater go?" The roof plan shows gutters, but nobody drew where the downpipes discharge. In the wet season the water ends up against a wall or on the neighbour's land. A good site plan shows every downpipe, the drain and the soakaway.
- "How high is the floor?" The plans show rooms but not levels. Is the bathroom 2 cm lower than the bedroom? Is the terrace a step down? Levels decide where water flows, so they belong on every plan and section.
- "Which tile, and which way?" Without a finishes schedule and a tile layout, the team picks a starting point. Cut tiles end up at the door, and the shower floor falls the wrong way.
- "Where is the socket for the TV?" If the electrical layout only shows lights, every socket is placed by habit. Moving one after plastering means cutting the wall.
- "Can this beam go here?" When the architectural and structural drawings disagree, the site waits. Or worse, someone moves a column without asking the engineer. A coordinated set avoids both.
None of these are rare or difficult. They are simply easy to leave out when a set is drawn only for the permit. Each open question means someone on site waits, and on a busy villa site they add up fast.
You can check for these gaps yourself before building starts. Take the five questions above and try to answer each one from the drawings alone. If you can't, the builder can't either.
All of this decides one thing owners care about most: the price.
What a builder can price at each stage
A builder's quote is only as good as the drawings behind it. This table shows what a builder can and cannot price from each set.
| Stage | A builder can price | A builder has to guess | Quote is good for |
|---|---|---|---|
| Concept | Size in m², a rough per-m² range | Structure, finishes, services, openings | A first budget check |
| Schematic | Areas, walls, roof form, number of openings | Details, finishes, services, foundations | Comparing design options |
| Permit | Structure outline, main quantities | Details, finish levels, fittings, exact services | A budget with allowances |
| Construction | Quantities, openings, finishes, services, structure | Site surprises, like soil or access | A contract price |
Watch for allowances. A quote from early drawings fills gaps with "provisional sums": a guess for tiles, fittings or a pool. If the real choice costs more, you pay the difference. Two quotes from the same permit set can differ a lot simply because each builder guessed differently.
The fix is simple. Ask every builder to quote from the same construction set and the same finishes schedule. Then you are comparing prices, not guesses. Our guide on the cost to build a villa in Bali shows how a full budget breaks down.
So how do you know if the set you are paying for is complete?
What a good drawing set looks like
- 1
It has every sheet type listed above
Plans, elevations, sections, roof plan, details, schedules, electrical, plumbing and structure. Ask for the sheet index on page one.
- 2
The sheets agree with each other
A window on the elevation matches the plan and the schedule. A beam doesn't cross a duct. Coordination is the hidden work.
- 3
The wet and hot spots are detailed
Sills, showers, roof edges and gutters each have a large-scale detail, drawn for heavy tropical rain.
- 4
Every finish has a name
The finishes schedule lists the product or a clear spec, so no quote needs a guess.
- 5
Revisions are tracked
Each change gets a new letter and a date, and the site always works from the latest one.
Because the same team draws and builds, our construction sets are made to be built from, not just approved. It starts with a Brief Review: in one week we read your plot, the people who will live there and the budget, and tell you in writing what the drawings will need to solve.
Questions owners ask
How can I understand architectural drawings?
Start with the title block, the scale and the units: most villa drawings are in millimetres, and 1:100 means 1 cm on paper is 1 m on site. Then find the north arrow and follow the section marks between sheets. Ask your architect to walk you through one floor plan and one section; after that, most sheets read the same way.
How do architects draw a house?
In stages. First a concept with sketches and 3D views, then a schematic design that fixes the layout, then a permit set for the building approval, and finally the construction set with details, schedules, electrical, plumbing and the engineer's structural drawings. Each stage adds sheets and makes the earlier ones more precise.
What is 30%, 60%, 90% design?
It is a shorthand for how complete a design set is. Around 30 % the layout and look are agreed, around 60 % the main systems and dimensions are in, and around 90 % the set is nearly ready to build and price. The numbers are a rough guide, not a measurement.
What are the 7 stages of architectural design?
Lists differ, but a common one is: brief, concept, schematic design, design development, construction documents, tender or pricing, and construction support. For a villa in Bali, the stages that matter most to the builder are the permit set and the construction set.
Can a builder price a villa from permit drawings?
Only roughly. Permit drawings show the layout and structure, but usually not the details, finishes or exact services, so the quote fills the gaps with allowances. For a price you can sign, ask every builder to quote from the same construction set and finishes schedule.