How to choose aconstruction company in Bali
Twelve checks to run before you sign with a construction company in Bali: the work to visit, how the price is built, who runs the site, how you pay and what happens after handover.
Why the quote is the wrong place to start
Most owners compare a construction company in Bali by the total at the bottom of the quote. That number is the least reliable thing on the page.
A total is a promise. It holds only if the drawings are complete, the prices behind it are real and someone on site keeps the work on track. Two quotes with the same total can lead to two very different villas, and two very different final bills.
So this guide does not rank builders. It gives you twelve checks to run on any builder, before you sign. Each one asks for proof you can see, not a promise.
If you are still choosing who designs the villa, start with our guide on how to choose an architect in Bali. This one is about the people who build it.
Don't choose the lowest total. Choose the builder whose total you can check line by line.
Here are all twelve checks on one card. Tick the ones a builder has already shown you.
Twelve checks: score a builder before you sign
The card groups the checks into four parts: their work, their site, their money and their paperwork. Tick only what you have seen with your own eyes. Your answers stay in your browser and are not saved.
Tick each check the company has already shown you, not what it promises.
A low score does not mean a bad builder. It means you don't know enough yet. Most gaps close with one email, and how a builder answers it tells you a lot.
The first three checks are about work you can touch. Here is what to look at.
Check the workmanship, not the photos
A portfolio shows a villa on its best day. You want to see one on an ordinary day, a year or two after the keys. Ask for the address of a finished project, and go.
Look low and look close. Check the bottom of the walls for damp and the ceilings for stains. Check whether tiles sound hollow when you tap them. See if doors close without scraping, and whether the shower water runs to the drain.
Then look at work that will soon be hidden. On a running site, the steel inside columns and beams is still visible. The bars should be clean, tied firmly at every crossing and held off the ground on small spacers, so concrete can cover them on all sides.
Finally, talk to past owners. Ask the builder for two, and call them yourself. Don't ask "were you happy?" Ask "what went wrong, and what did they do about it?" Every build has problems; the answer shows how they handle them.
The most important work is the work you will never see again.
Ask the builder to send photos of the steel before every concrete pour. If they already do this as a habit, that is a good sign.
Finished work tells you about the past. A running site tells you how they work today.
Visit a site that is running
Ask to see one of their current projects, on a normal working day. Stay longer than planned: a site that only looks good for an hour is not well run.
The first question is simple: who is in charge here today? In Bali, the person who sold you the villa is rarely the person on site. You want a named site manager who is there every working day, who reads the drawings and who can answer a question without phoning someone. Ask how many sites that person runs at once.
Then look around. Are cement bags stored off the ground and under cover? Is there a printed set of drawings on site, and is it the latest one? Are walls straight and levels checked with a line, or by eye? Is the site reasonably tidy at the end of the day? None of this needs a technical eye. It needs ten quiet minutes.
Language matters too. Ask in which language the reports, the contract and the daily messages will be. If you don't speak Indonesian, make sure someone on their side writes clearly in English.
Small habits on a site show how the big things are done.
Watch whether the crew checks lines and levels as they go. Teams that measure often rarely need to tear work down later.
Good work on site still needs a price you can follow. That is where most problems start.
How they price, and how they buy materials
Builders in Bali usually quote in one of two ways. A lump sum is one total for the whole villa. An itemised bill of quantities (BoQ) lists every part of the work, with a quantity, a unit and a unit price: so many m³ of concrete, so many m² of tiles. The table compares them.
| Quote type | What you get | When something changes | Works best when |
|---|---|---|---|
| Lump sum, one total | A single number, often with a short list of inclusions | Hard to check; the new price is whatever the builder says | The drawings are complete and very little will change |
| Price per m² | A rate times the floor area | Unclear what the rate includes, so extras appear later | Only for a first rough budget, never for a contract |
| Itemised BoQ | Every item with quantity, unit and unit price | You can price a change from the same unit rates | You want to compare builders and control changes |
A BoQ also lets you compare builders fairly. Put two quotes side by side and the gaps appear: one builder has left out the septic tank, another prices half the tiles you need. A lower total often means a shorter list, not a cheaper builder. Our guide on the cost to build a villa in Bali explains what a full budget should include.
Materials. Ask who buys them and how you can check. Some include everything; some let you buy finishes like tiles and taps. Either can work. What matters is that the BoQ names the material, the brand or grade and the size, so "ceramic tile" can't quietly become a cheaper one. Ask to see delivery notes for key items such as cement, steel and roofing.
A clear price is half the deal. The other half is how and when the money moves.
Payments, changes and weekly reports
Pay for work that is done, not work that is promised. A fair schedule ties each payment to a stage you can check on site. The bar shows one example.
Be careful with a large payment up front. If most of the money goes before the walls are up, you have little left to keep work moving. The last small part, the retention, is held back until the defects are fixed.
Changes. Every build has some. You change a window, or the builder finds rock where the drawings show soil. These changes are called variations. The rule is simple: the price and the extra time are agreed in writing before the work is done, using the unit rates in the BoQ. A change agreed only on WhatsApp is a dispute waiting to happen.
Reports. Ask for a weekly report and a sample of one. A useful report fits on a page or two. It shows photos, what was done, what is next, any problems and progress against the schedule. If you live abroad, this report is your eyes on site.
Then there is the paperwork that protects you after the builder leaves.
The paper checks
Who you sign with. Make sure the contract is with a company, not with a person, and that the company is a registered legal business entity in Indonesia. Businesses register through the government's OSS system. Check that the name on the contract matches the name on the company documents and on the bank account you pay into.
Defects period. After handover, small problems appear: a dripping tap, a crack in plaster, a door that sticks. The contract should give a fixed defects period after handover, during which the builder returns to fix them. The retention money is released only when that list is closed.
Liability for the structure. Serious failures are a different matter. Under Indonesia's Construction Services Law No. 2 of 2017, Article 65, the builder is responsible for building failure for a period linked to the planned life of the building, up to ten years, and that period must be stated in the contract. The law has since been amended, so check how it applies to your contract with a lawyer or notary. Hukumonline has a plain summary in Indonesian.
Permits. Ask who handles the building approval (PBG) and when. Building should not start before it is in place. Our guide on how to build a villa in Bali shows where permits sit in the timeline.
Schedule. Ask for a written timeline with the main stages and a handover month. It gives the weekly reports something to measure against.
By now some warning signs will have stood out. Here are the ones to take seriously.
Red flags, and what good looks like
- A big payment before work starts. Money paid ahead of the work removes your only leverage.
- One total, no breakdown. If they won't show a BoQ, you can't check the price or price a change.
- Nobody named for your site. "Our team" is not a site manager.
- No site you can visit. Only photos and renders, and a reason why every project is "not ready to show".
- Changes agreed by chat only. No written price, no written time.
- The contract is with a person, or a different company name. Or the bank account is in yet another name.
And here is the other side: what a builder worth signing with does without being asked.
- 1
Shows you finished work and a running site
Gives you addresses and owners' numbers, and lets you walk around on your own.
- 2
Prices line by line
Sends an itemised BoQ with named materials, and uses the same rates for every change.
- 3
Puts one person on your site
Names the site manager, who is there every working day and writes the weekly report.
- 4
Ties money to progress
Asks for payment only after a stage you can check, and holds a retention for defects.
- 5
Writes the after-care down
States the defects period and the liability for the structure in the contract.
As a design & build studio, we draw and build with the same team, so the BoQ comes straight from our own drawings and every change is priced from the same lines. It starts with a Brief Review: in one week we read your plot, your wishes and your budget, and give you the result in writing, with a first idea of cost and time.
Questions owners ask
How do I choose a builder in Bali?
Visit a villa they finished and a site they are running, and ask for an itemised bill of quantities. Then check who will be on your site every day, how payments follow the stages, and what the contract says about defects and the structure. The twelve checks in this guide cover each step.
How much does it cost to build a house in Bali?
It depends on the size, the site, the materials and the drawings, so a single number is not reliable. Ask builders for an itemised quote based on the same drawings, so you can compare them line by line. Our guide on the cost to build a villa in Bali explains what a full budget should include.
Which construction company is best for work?
There is no single best company. The right one is the builder who shows you finished work, prices line by line, names a site manager and writes payments, changes and after-care into the contract. Use the scorecard in this guide to compare the companies on your shortlist.
Should I hire a builder and an architect separately?
Both ways can work. Separate contracts give you more choice but leave a gap between drawings and site that you have to manage. A design and build team draws and builds with one team. Our guide on how to choose an architect in Bali covers the design side.