Architect fees Bali: percentage,per m² and what each phase includes
The architect fees Bali studios quote, explained in plain numbers: the IAI percentage guideline, how a per m² quote compares, and what you should get in each design phase.
Why two quotes never match
Compare the architect fees Bali studios send you and you may see three answers that differ by double. Often they are not quoting the same job.
One studio quotes a percentage of the build cost. Another quotes a price per m². A third gives one fixed number. On paper the cheapest looks like the winner. But the cheap one may stop at a concept and a few 3D images, while the others include the drawings your builder needs.
So the real question is not "how much?" It is "how much, for what?" This guide shows the three ways fees are set, what the Indonesian fee guideline says, and what each design phase should give you. You will finish with a way to compare offers line by line.
Compare architect fees by what is delivered in each phase, not by the total at the bottom.
First, the three ways a fee can be written.
Three ways architects charge
Most offers you see in Bali use one of these methods. Each one rewards a different thing, so it helps to know which one you are reading.
| Method | How it works | Good for you when | Watch out for |
|---|---|---|---|
| Percentage | A share of the construction cost, often based on the IAI guideline | The scope is full: concept to site visits | The fee grows if the build cost grows, even when the design work does not |
| Per m² | A rate times the floor area | The size is fixed early and the brief is simple | Which areas count: terraces, pool deck, roof? |
| Fixed fee | One amount, paid by stage | The scope and drawing list are written down in detail | Extra revisions and extra visits billed on top |
None of these is better by itself. A per m² rate and a percentage can land on the same number. What changes is who carries the risk when the villa grows, the finishes change or the design goes through a fourth round of changes.
Ask every studio to show the same offer in a second format. If one quotes per m², ask what that is as a share of your build budget. The comparison gets much easier.
For the percentage method, Indonesia has a published reference.
The IAI percentage guideline
The Indonesian Institute of Architects (IAI) publishes a fee table. The bigger the build cost, the lower the percentage. Move the slider to see the band for an example budget, and the same fee per m².
- Concept≈ Rp 22 m
- Developed design≈ Rp 36 m
- Documentation≈ Rp 58 m
- Site visits≈ Rp 29 m
Illustration, not a quote. Band = IAI categories 1 to 3, drawn as a straight line between the published rows (Rp 0.2, 2, 4 and 20 billion). Source: IAI Jawa Timur fee table, from the IAI guideline (2007 edition). The phase split is an example only; real offers split the fee in their own way.
A worked example. A villa that costs Rp 2 billion to build sits at about 5.5 to 6.5 % in the table. That puts a full design fee at roughly Rp 110 to 130 million, from concept to site visits. On 250 m² of floor, the same fee is about Rp 440,000 to 520,000 per m².
In the published table, private homes sit in the upper category, so expect the top of the band for a villa. The table is a guideline. Architects can charge more or less, and many in Bali don't use it at all. Online, the architect fees Bali agencies list often show much wider ranges, usually without saying what they include.
The percentage tells you the size of the fee. The phases tell you what it buys.
Phase 1: concept
The concept phase turns your brief into a first idea. The architect studies the plot, the sun, the slope, the views and the rules for the zone. Then they test a few ways to place the villa.
What you should get: a site study, two or three layout options, simple massing models or 3D views, and a first cost check against your budget. The goal is to agree on the big moves before anyone spends time on detail.
This is the cheapest phase to change your mind. Moving a bedroom now costs an afternoon. Moving it during construction costs a wall.
The concept is where changes are cheap.
Ask how many concept options and revision rounds the fee includes. Two or three rounds is a common number to write into the offer.
Once the idea is agreed, it has to become a building that stands up.
Phase 2: developed design
In developed design, the concept gets real sizes. Rooms, walls, windows, roof pitch and stairs are fixed. The structural engineer joins to size the columns, beams and foundations. Services such as water, power and drainage get a first layout.
What you should get: plans, sections and elevations at a set scale, a first materials list, and an updated cost estimate. In Bali, this is also the stage where the design is checked against the local building rules, so the permit drawings can follow.
Ask who pays the engineer. Some studios include structure and services in the fee. Others leave them out, and you hire the engineers yourself. Both are fine, as long as you know which one you have.
The next phase is the one cheap offers leave out most often.
Phase 3: documentation
Documentation is the drawing set your builder prices and builds from. It is usually the largest block of work, because every detail has to be drawn: wall build-ups, roof edges, gutters, tile layouts, sockets, pipes, doors and windows.
What you should get: a full construction set with details, door and window schedules, electrical and plumbing layouts, the engineer's structural drawings and a written specification of finishes. Our guide to the architectural drawing set explains each sheet.
Without this set, the builder fills the gaps on site. Each gap becomes a question, a delay or a change order. That is why a low fee that ends at "design" can cost you more in the end.
The drawing list is the real scope of the fee.
Ask for the list of drawings in the offer. If details, schedules and services are missing, the fee covers less than it seems.
After the drawings come the costs that sit outside them.
Phase 4: site visits and extras
The last phase is support during construction. The architect visits the site, answers the builder's questions and checks that the work follows the drawings. These are usually periodic visits, not a person on site every day.
Around the four phases sit the items that are often priced on top. Check each one before you sign:
- Structural and services engineering. Columns, beams, foundations, electrical, plumbing and drainage. Included or separate?
- Interior design and furniture. Joinery, lighting and loose furniture are often a separate scope with a separate fee.
- Landscape. Planting, paving and pool surrounds may need their own drawings.
- Extra revisions. Rounds beyond the agreed number are usually billed by the hour or per round.
- Extra site visits and travel. Ask how many visits are included and what each extra one costs.
- Permit drawings and surveys. Land surveys, soil tests and the drawings for the building approval can be extra lines.
With all of that on the table, comparing offers becomes simple.
How to compare offers
Put every offer in one table, with the four phases as rows. Then fill in what each studio delivers, not what it charges. Our guide on how to choose an architect in Bali lists the questions that bring the gaps to the surface.
What a good offer looks like:
- 1
A written scope per phase
Each phase lists what you receive, so you can see what is missing before you sign.
- 2
A drawing list
The construction set is named sheet by sheet, including details and services.
- 3
Payment by stage
You pay after each phase is delivered, not the whole fee up front.
- 4
Clear limits
The number of revisions and site visits is written, with the price of extras.
- 5
Who owns the drawings
Architectural works are protected under Indonesia's copyright law (UU 28/2014, Article 40). Copyright usually stays with the author unless the contract says otherwise, so write down how you may use the design, now and later.
If one offer is far below the others, check which phase it leaves out. Usually it is documentation or site visits. Those are the two you will miss most once building starts.
Before anyone draws, we test the brief. In our Brief Review we read your plot, the people who will use the villa and the market it has to work in, and give you the result in writing, with the scope of each design phase spelled out. Then the same team designs it and builds it, so the drawings and the site stay one story.
Still have questions? These are the ones owners ask most.
Questions owners ask
What is a typical architect's fee?
In Indonesia, a full design fee is often set as a percentage of the construction cost. The IAI guideline table puts a Rp 2 billion build at about 5.5 to 6.5 %, and the percentage falls as the build cost rises. Many studios also quote per m² or a fixed fee, so always check what each phase includes.
What are reasonable architect fees?
A reasonable fee is one that matches the scope. Compare offers phase by phase: concept, developed design, documentation and site visits. A low fee that stops at the concept leaves out the drawings your builder needs, and those gaps usually come back as changes on site.
How much does a good architect charge?
There is no fixed price. Experience, the size of the villa and the scope all change the fee, and some architects charge above the IAI guideline while others charge below it. Judge the offer by its written scope, drawing list and number of site visits, not by the total alone.
Is there a cheaper alternative to an architect?
Some owners use a draftsman or a builder's in-house drawings, and design & build studios combine design and construction in one contract. Each option can work if the drawing set is complete. The risk with the cheapest route is that details get decided on site, one question at a time.
Do I own my architect's drawings?
Usually not by default. Under Indonesia's copyright law, architectural works are protected, and copyright generally stays with the author unless the contract says otherwise. You normally get the right to build the design on your plot. If you want to reuse or change it later, write that into the contract before you sign.